Water boiler plant near Opole

Print

REALIZED IN 2001 AND 2002

The water boiler plant, consisting of two water boilers, with a capacity of 3 700 kW each, heavy fuel oil-fired. The fuel is stored in two tanks (50m3) and then heated in an indirect tank made by BEST, to a normal temperature for combustion process.
The heating water buffer tank (hydraulic clutch) enables the regulation of water temperature in a boiler, in case of rapid changes of heat demand in a glasshouse.
This solution guarantees safe and long-term work of the system. It also helps avoiding the dewfall in the boiler, when it is fired with a fuel oil consisting sulphur.
The heavy fuel oil-fired boiler was used as a shutdown and boosting system.

The scope of work: design, materials delivery, installation.