Steam boiler plant - Czersk, near Chojnice

Print

REALIZED IN 2000

The steam water plant, with a capacity of 500 kg/h, a pressure of 10 bar, GZ-50 natural gas-fired, for a slaughterhouse. Moreover, BEST delivered and installed the feed water production system, with a partial thermal degasification system.

The scope of work: design, materials delivery (apart from a steam boiler and the feed water production system), and installation.