The steam boiler plant in Szalejów, near Kłodzko

Print

REALIZED IN 1999 AND 2000

The steam boiler plant, with a capacity of 2 600 kg/h, GZ-50 natural gas-fired and light oil fuel-fired, for technological processes of „Syntetyka” chemical company. The feed water tank was installed on a support structure (3,5 m above the floor level) in a boiler room.

The scope of work: design, materials delivery, and installation.